{"id":17492,"date":"2025-02-23T20:09:05","date_gmt":"2025-02-24T02:09:05","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-06-09-001\/"},"modified":"2025-02-23T20:09:32","modified_gmt":"2025-02-24T02:09:32","slug":"7-06-09-001","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-06-09-001\/","title":{"rendered":"Tom Muehlenbeck Recreation Center"},"excerpt":{"rendered":"
The Tom Muehlenbeck Recreation Center project, built for the City of Plano, included the new construction of an 83,845-square-foot community center located in the west area of Plano, TX. This award-winning facility serves as a recreational aquatic center for children and families and houses an eight-lane indoor competitive pool with two one-meter diving boards, an indoor leisure pool with two water slides, and an outdoor pool with three water slides and a waterfall. The project also features a gymnasium with an elevated running track, group exercise studio, locker rooms, underwater seating, an outdoor jogging trail, and a playground. Pedestrian bridges over the creek from the parking area to the entrance of the facility and preservation of trees completed the site work. The community center was constructed of a steel structural frame, tiled interior, stone fa\u00e7ades, wood panels, and large glass windows allowing natural light and a view of the creek, which bisects the property diagonally. Recreation Management Magazine awarded this project with a Design Award for Innovative Architecture for incorporating the facility into the surrounding natural landscape.<\/p>\n","protected":false},"featured_media":9874,"template":"","project_types":[113],"class_list":["post-17492","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17492\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/9874"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17492"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}