{"id":17514,"date":"2025-01-18T06:09:47","date_gmt":"2025-01-18T12:09:47","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-11-09-005\/"},"modified":"2025-01-18T06:10:05","modified_gmt":"2025-01-18T12:10:05","slug":"7-11-09-005","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-11-09-005\/","title":{"rendered":"Richardson Fire Station No. 4"},"excerpt":{"rendered":"

The City of Richardson Fire Station No. 4 project included the new construction of a four-bay, 14,090-square-foot fire station. The facility serves as the base for the Special Operations Team for the City and is equipped to staff a minimum of 10 firefighters and to house ambulance and heavy rescue vehicles. The station includes drive-through bay access, officer quarters, dormitories, an open kitchen and dining room, a shower and locker room, a fitness room, and a courtyard patio. The project features a long covered porch directing visitors to the entry lobby, stone-clad pylons with steel pipe struts supporting a large roof overhang highlighting the apparatus bays, natural daylighting, and polished concrete floors. The fire station was constructed of a piers and structural slab foundation with a steel frame, a standing seam roof, traditional roof forms, brick details, and rough-cut stone combined with stained wood, exposed steel, and modern detailing to help bridge the stylistic gap between the existing buildings. City of Richardson Fire Station No. 4 is an aesthetically pleasing, high-quality station that now provides additional fire safety resources to the community.<\/p>\n","protected":false},"featured_media":9812,"template":"","project_types":[113],"class_list":["post-17514","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17514\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/9812"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17514"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}