{"id":18034,"date":"2025-03-13T15:39:49","date_gmt":"2025-03-13T20:39:49","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-22-01-007\/"},"modified":"2025-03-13T15:40:10","modified_gmt":"2025-03-13T20:40:10","slug":"7-22-01-007","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-22-01-007\/","title":{"rendered":"City of Denton Fire Station No. 9"},"excerpt":{"rendered":"

City of Denton Fire Station No. 9 stands as a modern, two-story, 14,421-square-foot facility designed to elevate emergency response capabilities while prioritizing the health and efficiency of first responders. Located in Denton, TX, this state-of-the-art station features a meticulously planned apparatus bay with an integrated shop area, seamlessly connected to the facility through a specialized turnout room equipped with advanced laundry and storage systems to ensure optimal equipment hygiene and responder safety. The first floor offers a thoughtfully designed common area, ADA-compliant restrooms, an office, electrical and mechanical rooms, and a storage mezzanine, all tailored for operational excellence. The second floor enhances functionality and comfort with a fully equipped kitchen and dining area, a welcoming day room, dormitories, additional ADA restrooms, offices, and an observation deck that provides a commanding view of the surroundings. Accessibility is ensured with an elevator connecting the floors, while two iconic fire poles add a touch of tradition and efficiency, enabling rapid transitions to the first floor. This facility is a testament to innovation and dedication, serving as a cornerstone for the Denton community\u2019s safety and well-being.<\/p>\n","protected":false},"featured_media":18035,"template":"","project_types":[113],"class_list":["post-18034","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/18034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/18034\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/18035"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=18034"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=18034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}